Enabling Work
Enabling works service includes
-
Site survey and assessment
-
Proposal
-
Temp waterproofing works
-
Installation of temporary fire compartmentation
-
Builders works
-
Installation of Temp Water and Power to site
-
Prep works for steel strengthening works
-
Repair Works within occupied areas
-
Water damage repairs
-
Investigation works

Cabot square
Location: Canary Wharf , London
Type: Temp fire compartmentation, Temporary waterproofing works, Building plinths, Small works within occupied spaces.
Occupancy: Occupied and a challenging and demanding tenant & Facilities team
Loading-bay: Shared, Managed by Facilities Team, good access
Challenges: Access to tenant floors, lift availability, with deliveries for construction works and tenant deliveries

Columbus Courtyard
Location: Canary Wharf, London
Type: Temp Water and Power to the site, Waterproofing, Fire stopping
Occupancy: Unoccupied building,
Loading-bay: Good size loading bay
Challenges: Working within Canary Wharf (specific rules)

The Hub
Location: Victoria, London
Type: Temp Waterproofing, steel strengthening works, temp concrete works, temp steel support works, water damage repairs, Enabling works in stair landings, water management, fire compartmentation works, façade, live Plant room works, Works within occupied areas.
Occupancy: 50% occupied.
Loading-bay: Very challenging due to bus stops on either side of the building.
Challenges: The building above Victoria station platforms is a live building with live services. Access and storage are restricted. Water egress to the station is prohibited. There is noise and vibration.

Dacre Street
Location: Victoria, Central London
​
Type: De-sanitation, temp waterproofing works, Grouting works, and builders clean
Occupancy: Unoccupied building
Loading-bay: No loading bay, very restricted access to the building
Challenges: Access limitations, no lift.

Sloan Street
Location: Knightsbridge, London
Type: Temp Waterproofing Works, Repair works in the fully occupied neighbour building,
Occupancy: Unoccupied building
Loading-bay: Part of the road suspended for loading/unloading
Challenges: Small loading bay, no hoist or lift, crane too busy, no space for storage

Oxford Street
Location: Oxford Street, London
Type: Temp enclosures within the live shop, Retail shop works, small builders works within occupied areas. Weather screens
Occupancy: Partly occupied.
Loading-bay: Very busy due to the fast programme.
Challenges: Out-of-hours work due to live shop and council’s rules.

St. George's Hospital
Location: Balham, London
Type: Office repair works, flooring repairs
Occupancy: Occupied, some works within a live environment
Loading-bay: Good access
Challenges: Working within live Hospital.

Bloomsbury House
Location: Holborn, London
Type: Buildersworks, Jet washing façade, Upgrading listed doors
Occupancy: Unoccupied building
Loading-bay: No loading bay. All deliveries offloaded on the road
Challenges: Listed building

Verulam Point
Location: St Albans, AL1
Type: Raised access floor supply, Installation of metal flooring within risers.
Occupancy: Partly occupied
Loading-bay: Good access
Challenges: Working within live building

Country Hall
Location: Waterloo, London
​
Type: Builders works, Lime plaster repairs, joinery repairs, floor repairs, Graffiti removal, Blockwork repairs, Painting
Occupancy: Fully occupied building
Loading-bay: Good size, managed by facilities.
Challenges: Unusual Scope of works,