Logistics
Logistics service includes
-
Access Control and CCTV
-
Delivery Management & DMS
-
Training & Progression
-
FORS / CLOCS / CCS Prep and Support
-
Signage & Barriers Maintenance
-
Fire Plans & Fire Wardens
-
Fire Extinguisher Cleaning & Maintenance
-
Logistics Audits, Health & Safety Audits
-
Material Storage Planning
-
Toolkit
Typical Responsibilities
-
Maintaining Welfare Facilities
-
Material Storage and Handling
-
Access and Egress
-
Plant and Tool Management
-
Waste & Hazardous waste management
-
Site Setup and Enabling work
-
Contra Charging
-
Record Keeping
-
Delivery Management Systems
-
Hoarding, Fencing, Barriers
-
Hoist & Vertical Transport
-
Fire Safety in a Construction Environment
-
Site Safety
-
Site Security
-
Logistic Manager Responsibility
-
Conflict Management
How we support you
-
Maintain site in good order
-
Clean and well managed
-
Site presentation & Standards
-
Traffic & Pedestrian Management and Control at Main contractor interface points within the demise

80 New Bond Street
Constraints: Global tourist attraction, High-End Retail, Crane restrictions and road restrictions
Location: Oxford Street
Type: Logistics
Occupancy: Unoccupied, Party Wall
Loading-bay: Traffic is one-way on the public highway, with an interface for the beam hoist, goods hoist, and tower crane. Vehicles stop during lifting operations.
Challenges: Pedestrians, vehicles backed up onto Oxford Street, and Tower crane lifts require all vehicle movements to be stopped.

7 Princes Street
Constraints: TFL Red Route, Route for access restricted, Bank interchange restrictions
Location: Bank, City of London
Type: Logistics
Occupancy: Unoccupied, Neighbours
Loading-bay: On the public highway, traffic is in a one-way system, with an interface of the beam hoist, goods hoist, and tower crane.
Challenges: Pedestrians from Bank station walking to the city, cyclists, Bus stop relocation, Tower crane lifts requiring all vehicle movements to be stopped, Public Events, and works opposite the Bank of England.

Facebook, Kings Cross
Constraints: £25m Fitout in 25 weeks, Insufficient time for deliveries in and waste out
​
Location: Kings Cross
​
Type: Logistics
​
Occupancy: Unoccupied but retained Facilities team
​
Loading-bay: Shared, Managed by Facilities Team, good access but some height and weight restrictions
Challenges: Contractors required a large volume of materials and a strict booking system. The efficiency of the subcontractors was critical.

104-105 Berwick Street
Constraints: Confined Site, Restricted access, Residential Neighbours, S106 & Environmental restrictions. Significant number of Pedestrians
Location: Soho
Type: Logistics
Occupancy: Unoccupied
Loading-bay: None available, significant restrictions
Challenges: Deliveries, Tower Crane pick points, Confined site

154 Bayswater Road
Constraints: High-End Residential Area, S106 & Environmental restrictions. Opposite Kensington Gardens near the Embassy of Russia
Location: Bayswater
Type: Logistics
Noise: Sensitive in High-End Residential Areas
Vibration: Significant transfer due to a quiet environment
Occupancy: None
Loading-bay: Public highway
Challenges: Significant restrictions for unloading and vertical transport. Congestion at peak periods.
PC: Paragon Interserve

Columbia House
Constraints: Logistics on a busy arterial route. Hoist, vertical transport restrictions.
Location: Worthing, good access, but storage restrictions
Type: Logistics and Strip out
Occupancy: Unoccupied but in a quiet residential neighbourhood
Loading-bay: Good access and hoist
Challenges: Interested local residents and children

Newtown Road
Constraints: Proximity to Rail, Arterial route, Confined space, Contaminated Land. Major shopping centre neighbour
Location: Ashford
Type: Logistics
Occupancy: Partial completions and occupation by new occupants
Loading-bay: Restricted turning, blind corners, Access restrictions. Mud transfer to the public highway. Pedestrians crossing the site entrance.
Challenges: Vehicles on the public highway are moving at speed in the blind corner where the entrance to the loading bay is. Height restrictions under the rail bridge and vehicles not following designated delivery routes. Insufficient hardcore due to soil contaminations etc

14 St. Johns Lane
Constraints: Confined Site, Restricted access, Residential Neighbours, S106 & Environmental restrictions.
Location: Farringdon, London
Type: Installation of Site offices and welfare facilities. Logistics labour, management of vertical transport and Traffic management, Access control, CCTV
Occupancy: Unoccupied building
Loading-bay: No loading bay; all deliveries processed on the road
Challenges: Delivery restrictions, water management, neighbours.

19 Dacre Street
Constraints: Confined Site, Restricted access, Residential Neighbours, S106 & Environmental restrictions.
Location: Victoria, London
Type: Installation of site offices and welfare facilities. Managing exclusion zones, vertical access, builders clean and waste
Occupancy: Unoccupied building
Loading-bay: No loading bay, very restricted access to the building
Challenges: Access limitations, no lift.

18B Charles Street
Constraints: Restricted access, Residential Neighbours
​
Location: Green Park, London
Type: Security, legionella, cleaning, water management
Occupancy: Unoccupied building
Loading-bay: No loading bay; all deliveries processed on the road
Challenges: N/A

31 Borough High Street
Constraints: TFL Red Route, Route for access restricted, Project above the busy underground station.
Location: London Bridge, London
Type: Consolidation. Out-of-hours deliveries to the site due to restrictions
Occupancy: Partly Occupied
Loading-bay: No loading bay, double Red line outside the property.
Challenges: All deliveries and waste done out of hours….

107 Fenchurch Street
Constraints: Confined Site, Restricted access, S106, & Environmental restrictions.
Location: Fenchurch Street, London
Type: Management of vertical and horizontal material distribution, security, and Traffic management
Occupancy: Unoccupied building
Loading-bay: Small loading bay. All vehicles have to be reversed.
Challenges: Working next door to a huge construction project.

143 Farringdon Road
Constraints: Confined Site, Restricted access, Residential Neighbours, S106 & Environmental restrictions. A significant number of Pedestrians
Location: Farringdon, London
Type: Traffic management system,
Occupancy: Unoccupied building
Loading bay: There is no loading bay; the area is suspended on the main road.
Challenges: Project next to a very busy road. (Red Route)

Apex Reading
Constraints: Large building with many tenants and many builders within one building.
Location: Next to the Reading train station.
Type: Logistics labour
Occupancy: Works carried out within a fully operating building with full occupancy
Loading bay: Loading bay shared with occupants.
Challenges: Live building with live services. Restricted access and storage.

Renaissance Hotel
Constraints: Global tourist attraction, working within live hotel, Council and building restrictions
Location: Kings Cross, London
Type: Logistics
Occupancy: Works are carried out within a fully operating hotel and among residents.
Loading-bay: This tiny loading bay is shared with occupants.
Challenges: Live hotel. Restricted access and storage.